Curated
Back B @bocatv 1 min read
news

BocaTV Studio Begins Post-Construction Cleanup Phase

Specialized cleaning prepares the new space for vinyl flooring installation and double-pane protective glass.

Construction on the new BocaTV studio has advanced to the post-construction cleanup phase. The work involves removing debris and dust to prepare the space for vinyl flooring and double-pane glass installation.

Construction on BocaTV's new space has reached the post-construction technical cleanup phase. This step prepares the rooms for the upcoming finishing stages and studio infrastructure installation.

The process was divided into stages, starting with heavy debris removal and vacuuming excess dust accumulated on the floor and platform across the renovation area. Thorough pre-cleaning is required to clear the space for vinyl flooring installation.

PUBLICIDADE (GAM) — 1250x250

The work also included specialized cleaning of the glass structures. The studio design includes installing a second protective layer of double-pane glass, requiring clear and spotless surfaces before final sealing.

BocaTV Studio Begins Post-Construction Cleanup Phase
PUBLICIDADE (GAM) — 1250x250